Main discipline
Installation
Experience
Specialist (> 15 years)Nationality
IndonesiaOther discipline
I’m Scientist, Pipeline, Construction and Engineering in Specialist Structure of Body with H-Beam, Plate and Weld:
1. Pipeline/Piping Engineer: Welding Engineer & Field Joint Coating
2. Mechanical Engineer in Structure of Body: Aerospace, Submarine/Naval Architect, Hangars, Storage Tank, Vessel, Over Head Cranes, Shelter, Bridge, Pipe rack and Girder.
Achievement:
I am Indonesian who first discovered the rubber coating chipped in Project PipelineArBelin Sumatera370KM from Arun/Aceh to Belawan/Medan(ArBel) and Pipeline MKMT in Jakarta 30KM from MuaraKarang to MuaraTawar(MKMT) coral that has never been detected / Inspection in the project pipeline conducted by PT. Pertamina (circa 1980s), caused by pipes that are already on standby in the above Weld Joint longer to be influenced by several factors such as the effect of hot weather, the cold night rain resulting in chipped rubber joints Coating
••••••••••••••••••••••
2014 - 2016
•••••••
•••
2014 - 2016
•
2013 - 2014
•
••••••••••••••••••••••••••••••••••••••••••••••••••••••
2000 - 2001
••••••••
•••••••••
1999 - 2002
•
•••••••••••••
1996 - 1998
•
••••••••••••••••••••••••••••••
1990 - 1993
•
1970 - 2012
•
•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
1970 - 2002
••••••••
••••••••••••••••••••••••••••••••
1970 - 2001
•••••••••••••••••
•••••••••••••••••••••••••••••••••••••••••••••••••••
1970 - 2000
•••••••••••••••
••••••••••••••••••••••••••••••••
1970 - 1996
•
•••••••••••••••••••••••••••
1970 - 1995
•••••••••••••
•••••••
Jan 1997 - Jan 2002
•••••••
Jan 1997 - Jan 2002
Jan 1997 - Jan 2002
•••••••
Jan 1997 - Jan 2002
Jan 1987 - Jan 1990
Jan 1984 - Jan 1987
Jan 1981 - Jan 1984
Jan 1975 - Jan 1981
Reviewer Name | Project Name | Review | Deadlines | Quality | Communication |
---|---|---|---|---|---|
No reviews yet |