Hire the best freelancers in pre commissioning for your project
An innovative Chartered Quality, Risk and HSSE Professional – CQI Member (CQP MCQI), IRCA Certified Principal Auditor QMS, with a wealth of proven experience in senior management, implementation, delivery, and handover of multi-billion-dollar projects. A specialist in FPSO, Turrets, Subsea, Topsides, Platform & Jackets, Auditing and Decommissioning. Defining input for FEED, evaluation, kick-off, qualification, procurement, project execution, risk management and mitigation, auditing, commissioning, package close out, handover, RFSU and Operations. Pragmatic yet technical in approach, while determining the safest, cost effective and compliant solutions. Proven in multiple Major and Mega Projects operating within Project Management and Executive Management Teams. Continuous Improvement for Projects and Decommissioning in unchartered territory and devising pioneering solutions. Focused on Quality, HSSE, Risk, strategy, process, management, and teamwork to achieve goals across multi-functional teams. Fully conversant with International Standards and worldwide Regulations, leading audits, investigations, and project teams across multiple tasks, internally and through contractor & supplier networks
Engineer, Manager, Other, Supervisor / Technician
* A growth-oriented position in a professionally managed and dynamic organization that provides opportunities for career development and responsibilities to contribute towards organizational success. * I have more than 10 years' experience in onshore & offshore Fabrication, * Experience as Product design for Subsea Surface Wellhead & X mass Tree * I am able to lead /supervise integrated process of Design Review, Fabrication, Erection for Structural, Piping, E&I, Insulation & Mechanical system, which is included in parts of Mechanical Completion, Pre-commissioning & Commissioning EPCIC Project Green field & Brown field. Project Fabrication and Erection Structural (Jacket, CPP, LQ, WHP, Pipe Rack etc.) Piping process, Vessels, Tanks, LNG Plant etc. Design and Engineering Execution Surface Wellhead and X-mas tree (single, double, triple bore) and Subsea Wellhead for high pressure and high temperature. * I am has experience for drafting skill and detail oriented for engineering work flow. * Experience as construction representative and Material control for FPSO conversion Project. * I am familiar with method installation for construction phase and final installation for oil and Gas project. * I am has experience for project management role and my previous position as Senior Project Engineer -act. Project Manager for fabrication stage. * I am has experience for piping installation both designing and execution during fabrication stage
Engineer, Inspector, Drafter / Designer, Superintendent, Manager, Supervisor / Technician
Luis Antonio, is a motivated, energetic, accomplished professional with extensive experience in the upstream oil and gas: Drilling, Workover, Completion, P&A Wells Projects and Decommissioning Well Operations as well. Determined and Decisive; Uses Initiative to Develop Effective Solutions to Problems and Provide Technical Support to Resolve Challenges of the Well Engineering Planning-Design, and Rig/Well-Site Operational Support. Results-Driven, Logical and Methodical Approach to
Engineer
Senior Completions Manager McDermott Inc Jan 2024 – Mar 2025 Company Overview: Wood Fiber LNG Project –Houston, TX, USA, Qingdao, China, and Squamish, Canada. Responsible for developing and leading Wood Fiber LNG Project completion program, CDMS and CSU Completions interface and support processing, providing the basis for safe, efficient, and seamless transition between project entities responsible for: Fabrication, Execution, Precommissioning, Commissioning, and Operations across a diverse international arena of operations. Responsible for leading and establishing the criteria, work flow process, procedures and reporting that form the basis of contract compliant Completions process, this entails completions management driven by discipline based installation process validation, functional checkout of asset identification, scope delineations and deliverables by module and subsystems in conjunction with establishing a Completions Data Management System that accurately identifies the scope of the project deliverables. The associated workflow processes have been meticulously established, resulting in a 'Lean' Completions Management that allows open work fronts in the field and expeditiously validates the Facility Permanent works based on the Pinnacle Document Concept. This has been established based on modular LNG Design and utilizes a dual delta concept. It allows for the early assignment of module-level allocations in parallel with systemization, thereby removing the constraints of initial subsystem-to-asset assignments. The dual approach to asset assignment, Module versus Subsystem, has enabled accelerated work package development in the Asian fabrication facilities before the IFC drawing release of Subsystem limit completion, resulting in a 120-day reduction in fabrication package development time to meet the fabrication Schedule. Provided meticulous Completions planning resulting in efficient execution of Completions workflow processes, procedures, and department setup and development on location in China, Canada, and the USA, with a demanding project schedule that was successfully maintained, demonstrating a commitment to meeting deadlines. Assigned, prioritized, and delegated tasks and responsibilities to departmental employees while overseeing multiple projects simultaneously and ensured tasks were efficiently completed. Completed complex projects on time while maintaining high-quality standards, showcasing strong project management abilities. Wood Fiber LNG Project: Houston, TX, USA, Qingdao, China, and Squamish, Canada. Revalidation Project Manager Kent PLC Jan 2021 – Dec 2023 Company Overview: Golden Pass LNG Project –TX, USA. Responsible for the award of all three Phases: Phase 1.1 advanced planning, Phase 1.2 site execution of revalidation processing, in addition to Phase 2.0 initiation of asset failure replacement engineering, procurement, reception, installation, and pre-comm, dynamic function verification of Golden Pass LNG Existing facilities award value above 70 USD. Responsible for the Advanced Work Package, which includes existing facilities' Validation process, Conceptualization, Development, Work Face, nomenclature, and model utilization with Smart Plant implementation in generating Work Face planning to support Advanced Work Package processing in advance of deployment to the site for the second phase of the Validation project. Advanced Work Package processing was utilized to generate revalidation Work Packages, enabling GPX to verify that the pre-field deployment planning for all facets of the Revalidation Scope had been completed. Authored and led the generation of scoping narratives, execution planning, procedures, and collective cost and risk mitigations that resulted in contract award of additional phases of works from GPX to Kent PLC. Phase 1.2 field execution utilized the AWP Revalidation Packages maintained in Hexagon Smart Plant, allowing GPX to provide electronic access to completed Golden Pass facilities Revalidation packages to FERC, PEMSA, and regional, as well as national, regulatory agencies, resulting in the expedited resolution of regulatory queries. All scope of assets revalidation was inclusive of Revalidation AWP Advanced Work Packaging, awarded to Kent PLC for utilization in existing Regas facilities to validate the existing facilities' permanent works as fit for use in LNG Export production by the Golden Pass Operating entity to support Trains 1, 2, and 3 production. Responsible for ensuring management system processes, sequenced priority focus, and contract compliance are safely maintained and executed, providing for a seamless transition between execution, Pre-commissioning, and Commissioning in conjunction with delivering regional FERC-PHMSA compliance through the Revalidation process. Provided management and leadership, which formed a basis for Zero "LTIR" and Lost Time Incident Recordables for exceeding 100,000 person-hours performed over a 12-month field execution period while maintaining +12.5% production in advance of the planned schedule. Manage Construction, CSU, and Engineering resources, developing Completion processes throughout the revalidation project's replacement in kind, "RIK" decommissioning material and equipment removal, material and equipment re-installation execution, pre-commissioning, and static and dynamic commissioning function testing. Golden Pass LNG, Revalidation Project was awarded two independent project level safety awards for "0" LTIR within a 12-month execution period, for a work force exceeding 120, these achievements were Team based and no singular employee produced event, it does however reflect my commitment to lead and support safe work process efficiently flows in very time constrained environments with challenging scope of activities. Golden Pass LNG Project –TX, USA. Project Completions Lead Wood Group Jan 2020 – Dec 2021 Company Overview: XTO Cowboy NGL Project – Permian Basin, USA. Manage Phase 2 Completions scope development, systemization, and workflow processing, focusing on establishing the efficiency of interfaces and the associated certification and validation processes across multiple contract entities. Manage and close out onsite Phase 1 completions work processes, ensuring the sequencing and priority of system completion processing are maintained and supporting a seamless transition between Execution, Pre-commissioning, and Commissioning. Provide the Contractor with a resource for developing Lean Completions processes throughout the Project's execution, pre-commissioning, and Commissioning phases. Project Phase 1 was completed on schedule. The Phase 2 Completions portion was provided to the Engineering Department for inclusion in the "Work Face" Planning for the Installation, Erection, Connection, and Commissioning of the permanent Phase 2.0 Work Packages. It was developed, validated, and handed over to the Company as "DFO" for future utilization on schedule. Note: This scope was facilitated in 2020 with minimal onsite personnel to support the project scope reduction efforts due to COVID conditions in the Permian Basin. XTO Cowboy NGL Project – Permian Basin, USA. Project Completions Manager Freeport LNG Jan 2018 – Dec 2020 Company Overview: FLNG Project – Texas, USA. Management of the FLNG Pre-Treatment Facility completions program, ensuring safe work processes, sequenced priority focus, and contract compliance are maintained, providing a seamless transition between execution, Pre-commissioning, and Commissioning. Commissioning or developing Lean Completions processes throughout the Project's execution, including project commissioning, startup commissioning, and performance testing phases, in conjunction with the CSU systemization Project. This allows for the advanced introduction of hazardous chemicals, providing a level of acceleration for liquefaction production. Lead, facilitate, and manage all pre-energization, utility, and process system "Process System Safety Reviews" for the Pre-Treatment Facility. Managed the facilitation of achieving FERC Compliance for Hazardous Chemical Introduction and safely introducing Hydrocarbons, performed approximately 4 months before scheduled, including establishing the control room management process and all associated centralized control room change control management procedures. Established baseline for warranty tracking process and measurement in association with the facility's commercial qualification validation as an LNG operating facility. Project completed in advance of schedule. FLNG Project – Texas, USA. Project Completions Manager Cameron LNG Jan 2016 – Dec 2017 Company Overview: CLNG Project – La, USA. Responsible for assisting the Contractor with developing a complete contract compliant and allowing for a safe and seamless transition between execution, Precommissioning, Commissioning, and Operations. Primary in assisting Contractor with establishing criteriContractoract compliant Completions process entailing completions management driven by asset identification, scope delineations and deliverables in conjunction with establishing a Completions Data Management System the associated work flow processes resulting in 'Lean' Completions Management that provided a basis to open work fronts in the field and expeditiously validate the Facility Permanent works based on Pinnacle Document Concept. CLNG Project – La, USA. Project Completions Lead APLNG Jan 2014 – Dec 2015 Company Overview: Curtis Island, APLNG Project – Australia. Responsible for providing technical reviews and gap analyses of the Completions Management Process, Procedures, and Completions Data Management System maintained by the Contractor on the Project, in addition to implementing actions required to achieve a lean, productive, phase-controlled completions process. Actively participate in Operational Readiness reviews, issue identification and resolution, and lesson learned management. Project completed as per schedule. Curtis Island, APLNG Project – Australia. Project Completions Lead Qatargas Jan 2013 – Dec 2014 Company Overview: JBOG Project – Ras Laffan, Qatar. Responsibilities encompass managing JBOG Project Facility Completions processes, personnel, and activities to safely achieve a "Ready for Startup" state for Jetty-Based Boil Off Gas units, which supply all six Ras Laffan Berths. Responsible for providing technical reviews and gap analyses of the Completions Management Process, Procedures, and Completions Data Management System maintained by the Contractor on the Project, in addition to taking actions required to achieve a lean, productive, phase-controlled completions process. Actively participated in and managed facility system reverse function block development, system and subsystem execution workflow development, completion execution coordination, and participated in Operational Readiness reviews, issue identification and resolution, and lesson learned management. The project schedule was captured, accelerated, and completed before the schedule. JBOG Project – Ras Laffan, Qatar. Project Completions Lead RasGas Jan 2011 – Dec 2013 Company Overview: Helium 2 Project – Ras Laffan, Qatar. Responsible for leading Contractor, Air Liquide, in developing road Maps, procedures, and training Air Liquide Personnel in Work Face development, asset indexing, nomenclature identification, establishing bench marking engineering execution processing for asset registry and engineering function code golden rules, established, management, led and sponsored AWP workshops and integrated team training to stand up and insure AWP was successfully implemented utilizing "Project Road Map for Category III Project execution". Package development was established in Smart Plant in conjunction with asset nomenclature management during the early Engineering feed in MS Access 2010. It was then transitioned to and successfully maintained and managed in Smart Plant Foundation, utilizing an Oracle 9i database for storage, with Smart Plant EFI and TEF front-end access. Ensured Contractors' contractual compliance with project completion programatics were inclusive and provided a basis for a safe and seamless transition between Execution, Precommissioning, Commissioning, and Operations, and that all supporting requirements were inclusive of Systemization-based nomenclature assigned in Work Face review breakdowns, which addressed the following aspects of completions: QA-QC generated and approved ITPs, Pre-Com DOR, Dynamic Opercom and RFSU contractual gateway requirements, and addressed and, where required, inclusive to AWP. Primary in assisting Contractor wiContractorshing criteria of contract compliant Completions process entailing completions management driven by asset identification, scope delineations and deliverables in conjunction with establishing a Completions Data Management System the associated work flow processes resulting in 'Lean' Completions Management that provided a basis to open work fronts in the field and expeditiously validate the Facility Permanent works based on Pinnacle Document Concept. The project schedule was accelerated—it was completed ahead of schedule, shipping 173 Liquid Helium cargoes before the facility was handed over to the RasGas operations group. Helium 2 Project – Ras Laffan, Qatar. Project Completions Lead Qatargas Jan 2008 – Dec 2011 Company Overview: Mega Train 3 and 4 Project-RLC, Qatar. Management of the QG 3 and 4 Project completions program ensures safe work processes, sequenced priority focus, and contract compliance, providing a seamless transition between execution, Precommissioning, and CommissCommissioninged Commissioning Completions Departments comprising more than 45 personnel, with half of the department assigned and integrated into the CTJV Completions to streamline and train Lean Processing to the JV. Provide the contraContractora resource for developing Lean Completions processes throughout the projecProject'stion, pre-commissioning, commisCommissioningt-uCommissioningmance testing phases of our projecProjectdition to actively participating and managed facility system reverse function block development, system and subsubsystemecution workflow development, completions execution coordination, participating in Operational Readiness reviews, issue identification and resolution and lesson learned management. Lead, facilitate, and manage all utility and process system "Process System Safety Reviews" for the Pre-Treatment, Liquefaction production Facilities, and Berth 6. Managed the facilitation of achieving compliance in Hazardous Chemical Introduction approximately 3 months earlier than scheduled, and LNG production of Train 6 and 7 six months before the contractual scheduled commercial delivery. The project schedule was captured, accelerated, and completed before the schedule. Mega Train 3and4 Project-RLC, Qatar. Project Completions Lead Foster Wheeler Jan 2007 – Dec 2008 Company Overview: MEG Project-Jurong, Singapore. Maintain and manage the Turnover Department, including processes, procedures, personnel, and the Electronic Data Management System. Maintain accountability for all data collections, compilation, documentation, and electronic data required to assemble assets into systemized formats. Responsibilities include facilitating the education of all project personnel on project documentation to ensure a thorough understanding of contract requirements concerning the certification of the works. Liaise with internal and external concerned parties to coordinate the use of the system by subcontractors and affiliates. MEG Project-Jurong, Singapore. Project Completions Engineer Chevron Jan 2006 – Dec 2006 Company Overview: TAHITI Project, Texas, USA. Provided technical expertise within HAZOP performed at multiple LNG facilities throughout Central and Gulf Coast USA locations, including issue identification, recommendations, and resolution follow-up. Facilitated and produced multiple base case finding resolutions, resulting in schedule generation, project scope assembly, and subsequent technical overview narratives for an expansive list of facilities capital and revitalization efforts, as well as resolving findings associated with HAZOP studies. TAHITI Project, Texas, USA. Project Completions Lead Santos Engineering Jan 2005 – Dec 2006 Port Harcourt, Nigeria Company Overview: EAP-1A Project, EXXON. Responsible for establishing, managing, and reporting the completion processes, programmatics, and procedures that allow for safe and seamless transition between Execution, Precommissioning, Commissioning, and Operations. Primary in establishing criteria of contract compliant Completions process entailing completions management driven by asset identification, scope delineations and deliverables in conjunction with establishing a Completions Data Management System the associated work flow processes resulting in 'Lean' Completions Management that provided a basis to open work fronts in the field and expeditiously validate the Facility Permanent works based on Pinnacle Document Concept. The project schedule was accelerated and completed in advance of schedule. EAP-1A Project, EXXON. Project Completions Lead BHP Billiton Jan 2004 – Dec 2005 Company Overview: ROD Development Project Algeria. Responsible for the Contractor in developing a completion program that is contract compliant and will allow for a safe and seamless transition between Execution, Precommissioning, Commissioning, and Operations. PrimarContractorting Contractor with establishing criteria of contract compliant Completions process entailing completions management driven by asset identification, scope delineations and deliverables in conjunction with establishing a Completions Data Management System the associated work flow processes resulting in 'Lean' Completions Management that provided a basis to open work fronts in the field and expeditiously validate the Facility Permanent works based on Pinnacle Document Concept. The project schedule was accelerated and completed in advance of schedule. ROD Development Project Algeria. Project Completions Lead BHP Billiton Jan 2003 – Dec 2004 Company Overview: Ohanet Field Development Project, Algeria. Responsible for the Contractor in developing a completion program that is contract compliant and will allow for a safe and seamless transition between Execution, Precommissioning, Commissioning, and Operations. PrimContractoristing Contractor with establishing criteria of contract compliant Completions process entailing completions management driven by asset identification, scope delineations and deliverables in conjunction with establishing a Completions Data Management System the associated work flow processes resulting in 'Lean' Completions Management that provided a basis to open work fronts in the field and expeditiously validate the Facility Permanent works based on Pinnacle Document Concept. The project schedule was accelerated and completed in advance of schedule. Ohanet Field Development Project, Algeria. Project Completions Lead BP-Amoco Jan 2000 – Dec 2002 Company Overview: Boquerón Project, Maturín, Venezuela. Accountable for developing, managing, and facilitating safe and systematic completion processes aligned with achieving the scheduled commercial completion of the facility. Responsible for defining asset and system boundaries. Designed, developed, and implemented the Boquerón Data Manager system for retaining, storing, and managing line summaries, equipment listings, instrumentation and electrical records, custody documentation, incomplete work listings, and report generation. Project completed ahead of schedule. Boquerón Project, Maturín, Venezuela. EDUCATION Bachelor's of Business Administration in Engineering and Project Management PCU - Jun 1986 CERTIFICATIONS Level II Visual Inspection, North American Power Services, 1993 Visual Tube Welding Inspection, Hartford Pipe Tube and Boiler, 1994 High Density Polyethylene Welder, Fluid Controls, 1996 Hazardous Waste Site Operations, Mansfield, MA, 1996 Waste Water Treatment Operations, Massachusetts State Class' B' License, 1997 AWARDS Qatargas 3 and 4 Train 6 and 7 and Berth 6 JADT Lean Completions Processing Award - December 2010 Qatargas 3 and 4 Train 6 and 7 and Berth 6 JADT Onshore - 264 million Manhour Safety Award - September 2010 Qatargas JETTY BOIL-OFF GAS Recovery Project - Recognition of Increased RFSU Processing Efficiency - June 2013
Superintendent, Manager, Engineer, Inspector, Other, Supervisor / Technician
Over 20 years’ experience in the industry which will allow me to use my skills in the fields of Occupational Health, Safety and Environment to provide proactive HSE. It ranges from facilities management and oil & gas' upstream as well as downstream activities such as geophysical, seismic, exploration and drilling, marine transportation, and installation, EPCC, Automotive industries, Renewable energy and Train the Trainer.
Manager, Engineer, Inspector, Superintendent
WITH 30YRS AS COMMISSIONING AND START UP ENGINEER MAINLY IN LNG PLANTS OVERSEAS, 8YRS IN LIBYA LNG, 8YRS IN NIGERIA WITH SHELL LNG INCLUDING COMMISSIONING AND OPERATIONG 4 NEW LNG PLANTS INCLUDING ALL ASSOCIATED UTILITIES, LNG SHIP LOADING, CONDENSATE LOADING, GAS EXPORT COMPRESSORS,ALSO IMPLEMENT ELECTRONIC PTW SYSTEMS, INVOLVED WITH ALL CONSTRUTION MANAGEMENT TEAMS. AND NUMEROUS LNG PROJECTS WORLD WIDE AS COMMISSIONING ENGINEER/MANAGER
Engineer
●Engineered/Constructed/Commissioned 250+projects worldwide: 150+ small $1-$10 million; 75 medium $10-$99 million; 16 large $100-$900 million; & 10 mega-projects of $1 to $24 billion. ●Successfully Managed – Up to 30 concurrent projects. ●Licensed Professional Engineer: California & Alaska, can be licensed anywhere worldwide by comity. ●Education: BSME from University of California, Berkeley (always in the top 5, worldwide). ●Upstream Oil & Gas: 36 Oil & Gas Production / Separation / Reinjection / Shipping Facilities; Sealift modules to 2,600T/2320mT; 100s of Drillsites / Truckable Modules to 40T/36mT; 4000mi/6400km of Gathering / Injection Lines up to 60”/1500mm x 740psig/50barg and 24”/600mm x 3,280psig/221barg. ●Midstream Oil & Gas: 18,260mi / 29,216km of Transport Pipelines. Diameters to 60” / 1.5m & pressures to 5230psig / 361barg. Largest: 48” / 1.2m x 1180psig / 80barg x 800mi / 1280km and 40” / 1m x 1480psig / 100barg x 2400mi / 4000km (onshore, offshore, oil, gas, products, CO2, batching, spiking, conversions, reversals)., 75 Pump Stations; 45 Compressor Stations; 100+ Meter Stations; 3 underground gas storage plants; 11 major Terminals (marine, pipeline, railroad, truck, piers, loading arms, AFFF, recycle pipelines, fixed & floating roof tanks to 500,000bbl / 60,000cm, gas storage bullets and spheres). ●Downstream Oil & Gas: 6 Refineries (including 2 majors $3.5B & $1.5B; 30 concurrent turnaround projects), 1 Gas Plant; 20 retail gasoline / diesel / lubricant / LPG stations; 4 distribution centers. ●BU Power Plants Combined-Cycle CoGeneration: 40 to 50 MWe backup power plants as part of larger projects. ●BU Power Plants Diesel: 150+ 0.25 to 4.5 MWe backup power / remote main power plants as part of larger projects. ●Power Plants Solar: 300+ 0.25 to 2.5 MWe off-grid valve & meter station power as part of larger projects.
Manager
Electrical and instrumentation technician specialist in commissioning and start-up.
Supervisor / Technician
Profile: An experienced Subsea Controls Lead Engineer, currently responsible for the design, build, testing and delivery of a new state of the art in-riser control system. Other experience includes successfully delivering the FEED, design engineering, testing, commissioning, and start up of the Subsea Control System for Total's 70 well, 20 manifold deep-water Kaombo project. Chartered Engineering qualified (CEng) with over 8 years' experience that has covered all stages of major projects, including leadership and management responsibilities. To complement this diverse wealth of experience is a 1st Class Engineering Master's Degree with Honours, obtained from the highly prestigious University of Glasgow. A well-rounded Professional Engineer with charisma and passion that becomes infectious to others. Obtains a natural ability to read difficult situations quickly which has been a formidable skill when leading a team and developing fellow colleagues. Ensures a high focus on Client requirements as well as timely results, always adhering to HSE and others well-being.
Engineer
A competent manager/engineer with 30-years’ experience and a proven track record of delivering on technically challenging high value projects for operators and service provider, An organized self-starter, technically and commercially astute capable of achieving project or operational targets, A good communicator used to working in a multicultural environment with strong work ethics. Uncompromising in pursuit of, HSE excellence and high-quality delivery, experience includes; • 18 years’ experience in project leadership roles. • 16 years’ experience in international projects, Persian Gulf, Brazil, Mediterranean, Malaysia, China and the Philippines. • 13 years’ experience in SE Asia Projects.
Engineer
Lead operations Engineer,
Engineer
I have tried to spread my experience through all SMP areas in various resources but mostly oil and gas. Most of my career I worked in oil and gas projects but in the past few years the oil and gas sector has stalled due to low oil prices and obviously the pandemic so I have been doing minerals including Lithium, Alumina, Iron ore, Copper and so on. I’m based in perth too. I have worked in all phases of the project life cycle from conceptual through to commissioning to Brownfields and decommissioning. -Autocad user -Autocad Plant 3D user -Navisworks manger user -Autodesk Recap user - Laser scan processing software -Very strong excel skills. -Leadership roles -Commissioning phase of the Wheatstone Offshore platform and the INPEX FPSO. -Diploma Mech Eng -Diploma Project Management - 20 plus years engineering design and construct - Project Engineering roles with Clough, Chevron and INPEX - Brownfield design and construction - - Greenfields detail design and construct - Commissioning work on Wheatstone HUC with Chevron in the client office and Clough as the contractor -Hookup Engineer INPEX FPSO. - Coordination roles in punch list clearance and isolation authority training requirements on Chevron and INPEX projects - Workpack engineer - Project Engineer on the Wheatstone platform doing job carding man-hour estimates MTO and requisition
Drafter / Designer
Result driven and detail-oriented professional with 25 years of experience in Asset Integrity, Risk Management, Quality Control, Turnaround planning and execution. Driver for change in the asset integrity department to adopt digitalization and use of artificial intelligence. Efficient team leader with a sharp focus on manpower planning and optimization, task prioritization and performance evaluation. Supervision and coordination of on-stream and Turnaround/Shutdown inspections of static equipment, pipework systems, pipelines & storage tanks. Experienced in RBA engineering and identification of damage mechanisms.
Engineer
Engineer
Degree - Executive Bachelor in Industrial Engineering Technology (Mechanical & Maintenance), Diploma in Engineering Technology in Mechanical & Maintenance with More than 23 years of OIL & GAS hands-on experience in the varies Project in oil and gas Green/Brown Field, EPCC, EPCC+I, TOPSITE, SUBSEA and Pipeline Coating and Installation. Entrusted to handle and manage important role in overall project package and organization itself. Proven capability to lead in coordinating and managing from initiation stage Engineering (Detail Engineering), Procurement, Pre-fabrication and Construction onshore, offshore installation (Hook-up and Commissioning) and Handover to operation (asset owner). Task project and operation execution, strong thinker and highly motivated. Good in communication skill, exceptional work ethics and discipline, and good understanding on organization, relationship building and HSE. Involving in Inspection Engineering Technical, Quality Control Inspection and Assurance, Coating/Painting Subsea, Pipeline and Upstream, Material Coordination and Management, Project Expediting & Procurement, Heavy Structural Fabrication Installation, Pipeline Coating and Installation, Fabrication/modification Piping and Vessel maintenance/Integrity, Hook Up/Commissioning and Logistic. Ensure all Critical inspection or activities in accordance to applicable written standard, Codes and procedure and Comply with HSE. Conversant with the International Codes and Standard (ASME / AWS /ANSI / ASNT / API / ASTM / BS / ISO Quality Procedures).
Inspector, Superintendent, Engineer, Manager, Other
Total 14 years consecutive experience in the structure engineering, with variety of onshore and offshore projects in oil and gas industry. Perform structure integrity in planning, designing, inspecting and overseeing construction of building structure and facilities. Responsibility in the design operations, installation, including maintenance ensuring all aspects operation and associated process are in incompliance with project specifications and completed with planned and budget constraints
Engineer
Engineer