Hire the best freelancers in commissioning for your project
I'm fast learner and easy to adapt on new enviroment
Inspector
Over 13 years’ broad experience in leading from mechanical installation to full cycle pre-commissioning and commissioning rotating & static equipment’s from onshore to offshore of over 20 major brownfield and greenfield platform’s along with FPSO comprises of EPCC, EPCIC, EPCM and PCC projects with set deadlines, budgets along with scopes. Skilled in leading and managing construction & commissioning teams, decommissioning/ make safe of major equipment’s, troubleshooting, generating commissioning test plans, start up, stabilizing till performance test as well as managing mechanical completion systems. Known as a flexible and dedicated professional with solid technical background as well as outstanding time management, interpersonal and multitasking capabilities.
Engineer, Supervisor / Technician, Superintendent
Senior Completions Manager McDermott Inc Jan 2024 – Mar 2025 Company Overview: Wood Fiber LNG Project –Houston, TX, USA, Qingdao, China, and Squamish, Canada. Responsible for developing and leading Wood Fiber LNG Project completion program, CDMS and CSU Completions interface and support processing, providing the basis for safe, efficient, and seamless transition between project entities responsible for: Fabrication, Execution, Precommissioning, Commissioning, and Operations across a diverse international arena of operations. Responsible for leading and establishing the criteria, work flow process, procedures and reporting that form the basis of contract compliant Completions process, this entails completions management driven by discipline based installation process validation, functional checkout of asset identification, scope delineations and deliverables by module and subsystems in conjunction with establishing a Completions Data Management System that accurately identifies the scope of the project deliverables. The associated workflow processes have been meticulously established, resulting in a 'Lean' Completions Management that allows open work fronts in the field and expeditiously validates the Facility Permanent works based on the Pinnacle Document Concept. This has been established based on modular LNG Design and utilizes a dual delta concept. It allows for the early assignment of module-level allocations in parallel with systemization, thereby removing the constraints of initial subsystem-to-asset assignments. The dual approach to asset assignment, Module versus Subsystem, has enabled accelerated work package development in the Asian fabrication facilities before the IFC drawing release of Subsystem limit completion, resulting in a 120-day reduction in fabrication package development time to meet the fabrication Schedule. Provided meticulous Completions planning resulting in efficient execution of Completions workflow processes, procedures, and department setup and development on location in China, Canada, and the USA, with a demanding project schedule that was successfully maintained, demonstrating a commitment to meeting deadlines. Assigned, prioritized, and delegated tasks and responsibilities to departmental employees while overseeing multiple projects simultaneously and ensured tasks were efficiently completed. Completed complex projects on time while maintaining high-quality standards, showcasing strong project management abilities. Wood Fiber LNG Project: Houston, TX, USA, Qingdao, China, and Squamish, Canada. Revalidation Project Manager Kent PLC Jan 2021 – Dec 2023 Company Overview: Golden Pass LNG Project –TX, USA. Responsible for the award of all three Phases: Phase 1.1 advanced planning, Phase 1.2 site execution of revalidation processing, in addition to Phase 2.0 initiation of asset failure replacement engineering, procurement, reception, installation, and pre-comm, dynamic function verification of Golden Pass LNG Existing facilities award value above 70 USD. Responsible for the Advanced Work Package, which includes existing facilities' Validation process, Conceptualization, Development, Work Face, nomenclature, and model utilization with Smart Plant implementation in generating Work Face planning to support Advanced Work Package processing in advance of deployment to the site for the second phase of the Validation project. Advanced Work Package processing was utilized to generate revalidation Work Packages, enabling GPX to verify that the pre-field deployment planning for all facets of the Revalidation Scope had been completed. Authored and led the generation of scoping narratives, execution planning, procedures, and collective cost and risk mitigations that resulted in contract award of additional phases of works from GPX to Kent PLC. Phase 1.2 field execution utilized the AWP Revalidation Packages maintained in Hexagon Smart Plant, allowing GPX to provide electronic access to completed Golden Pass facilities Revalidation packages to FERC, PEMSA, and regional, as well as national, regulatory agencies, resulting in the expedited resolution of regulatory queries. All scope of assets revalidation was inclusive of Revalidation AWP Advanced Work Packaging, awarded to Kent PLC for utilization in existing Regas facilities to validate the existing facilities' permanent works as fit for use in LNG Export production by the Golden Pass Operating entity to support Trains 1, 2, and 3 production. Responsible for ensuring management system processes, sequenced priority focus, and contract compliance are safely maintained and executed, providing for a seamless transition between execution, Pre-commissioning, and Commissioning in conjunction with delivering regional FERC-PHMSA compliance through the Revalidation process. Provided management and leadership, which formed a basis for Zero "LTIR" and Lost Time Incident Recordables for exceeding 100,000 person-hours performed over a 12-month field execution period while maintaining +12.5% production in advance of the planned schedule. Manage Construction, CSU, and Engineering resources, developing Completion processes throughout the revalidation project's replacement in kind, "RIK" decommissioning material and equipment removal, material and equipment re-installation execution, pre-commissioning, and static and dynamic commissioning function testing. Golden Pass LNG, Revalidation Project was awarded two independent project level safety awards for "0" LTIR within a 12-month execution period, for a work force exceeding 120, these achievements were Team based and no singular employee produced event, it does however reflect my commitment to lead and support safe work process efficiently flows in very time constrained environments with challenging scope of activities. Golden Pass LNG Project –TX, USA. Project Completions Lead Wood Group Jan 2020 – Dec 2021 Company Overview: XTO Cowboy NGL Project – Permian Basin, USA. Manage Phase 2 Completions scope development, systemization, and workflow processing, focusing on establishing the efficiency of interfaces and the associated certification and validation processes across multiple contract entities. Manage and close out onsite Phase 1 completions work processes, ensuring the sequencing and priority of system completion processing are maintained and supporting a seamless transition between Execution, Pre-commissioning, and Commissioning. Provide the Contractor with a resource for developing Lean Completions processes throughout the Project's execution, pre-commissioning, and Commissioning phases. Project Phase 1 was completed on schedule. The Phase 2 Completions portion was provided to the Engineering Department for inclusion in the "Work Face" Planning for the Installation, Erection, Connection, and Commissioning of the permanent Phase 2.0 Work Packages. It was developed, validated, and handed over to the Company as "DFO" for future utilization on schedule. Note: This scope was facilitated in 2020 with minimal onsite personnel to support the project scope reduction efforts due to COVID conditions in the Permian Basin. XTO Cowboy NGL Project – Permian Basin, USA. Project Completions Manager Freeport LNG Jan 2018 – Dec 2020 Company Overview: FLNG Project – Texas, USA. Management of the FLNG Pre-Treatment Facility completions program, ensuring safe work processes, sequenced priority focus, and contract compliance are maintained, providing a seamless transition between execution, Pre-commissioning, and Commissioning. Commissioning or developing Lean Completions processes throughout the Project's execution, including project commissioning, startup commissioning, and performance testing phases, in conjunction with the CSU systemization Project. This allows for the advanced introduction of hazardous chemicals, providing a level of acceleration for liquefaction production. Lead, facilitate, and manage all pre-energization, utility, and process system "Process System Safety Reviews" for the Pre-Treatment Facility. Managed the facilitation of achieving FERC Compliance for Hazardous Chemical Introduction and safely introducing Hydrocarbons, performed approximately 4 months before scheduled, including establishing the control room management process and all associated centralized control room change control management procedures. Established baseline for warranty tracking process and measurement in association with the facility's commercial qualification validation as an LNG operating facility. Project completed in advance of schedule. FLNG Project – Texas, USA. Project Completions Manager Cameron LNG Jan 2016 – Dec 2017 Company Overview: CLNG Project – La, USA. Responsible for assisting the Contractor with developing a complete contract compliant and allowing for a safe and seamless transition between execution, Precommissioning, Commissioning, and Operations. Primary in assisting Contractor with establishing criteriContractoract compliant Completions process entailing completions management driven by asset identification, scope delineations and deliverables in conjunction with establishing a Completions Data Management System the associated work flow processes resulting in 'Lean' Completions Management that provided a basis to open work fronts in the field and expeditiously validate the Facility Permanent works based on Pinnacle Document Concept. CLNG Project – La, USA. Project Completions Lead APLNG Jan 2014 – Dec 2015 Company Overview: Curtis Island, APLNG Project – Australia. Responsible for providing technical reviews and gap analyses of the Completions Management Process, Procedures, and Completions Data Management System maintained by the Contractor on the Project, in addition to implementing actions required to achieve a lean, productive, phase-controlled completions process. Actively participate in Operational Readiness reviews, issue identification and resolution, and lesson learned management. Project completed as per schedule. Curtis Island, APLNG Project – Australia. Project Completions Lead Qatargas Jan 2013 – Dec 2014 Company Overview: JBOG Project – Ras Laffan, Qatar. Responsibilities encompass managing JBOG Project Facility Completions processes, personnel, and activities to safely achieve a "Ready for Startup" state for Jetty-Based Boil Off Gas units, which supply all six Ras Laffan Berths. Responsible for providing technical reviews and gap analyses of the Completions Management Process, Procedures, and Completions Data Management System maintained by the Contractor on the Project, in addition to taking actions required to achieve a lean, productive, phase-controlled completions process. Actively participated in and managed facility system reverse function block development, system and subsystem execution workflow development, completion execution coordination, and participated in Operational Readiness reviews, issue identification and resolution, and lesson learned management. The project schedule was captured, accelerated, and completed before the schedule. JBOG Project – Ras Laffan, Qatar. Project Completions Lead RasGas Jan 2011 – Dec 2013 Company Overview: Helium 2 Project – Ras Laffan, Qatar. Responsible for leading Contractor, Air Liquide, in developing road Maps, procedures, and training Air Liquide Personnel in Work Face development, asset indexing, nomenclature identification, establishing bench marking engineering execution processing for asset registry and engineering function code golden rules, established, management, led and sponsored AWP workshops and integrated team training to stand up and insure AWP was successfully implemented utilizing "Project Road Map for Category III Project execution". Package development was established in Smart Plant in conjunction with asset nomenclature management during the early Engineering feed in MS Access 2010. It was then transitioned to and successfully maintained and managed in Smart Plant Foundation, utilizing an Oracle 9i database for storage, with Smart Plant EFI and TEF front-end access. Ensured Contractors' contractual compliance with project completion programatics were inclusive and provided a basis for a safe and seamless transition between Execution, Precommissioning, Commissioning, and Operations, and that all supporting requirements were inclusive of Systemization-based nomenclature assigned in Work Face review breakdowns, which addressed the following aspects of completions: QA-QC generated and approved ITPs, Pre-Com DOR, Dynamic Opercom and RFSU contractual gateway requirements, and addressed and, where required, inclusive to AWP. Primary in assisting Contractor wiContractorshing criteria of contract compliant Completions process entailing completions management driven by asset identification, scope delineations and deliverables in conjunction with establishing a Completions Data Management System the associated work flow processes resulting in 'Lean' Completions Management that provided a basis to open work fronts in the field and expeditiously validate the Facility Permanent works based on Pinnacle Document Concept. The project schedule was accelerated—it was completed ahead of schedule, shipping 173 Liquid Helium cargoes before the facility was handed over to the RasGas operations group. Helium 2 Project – Ras Laffan, Qatar. Project Completions Lead Qatargas Jan 2008 – Dec 2011 Company Overview: Mega Train 3 and 4 Project-RLC, Qatar. Management of the QG 3 and 4 Project completions program ensures safe work processes, sequenced priority focus, and contract compliance, providing a seamless transition between execution, Precommissioning, and CommissCommissioninged Commissioning Completions Departments comprising more than 45 personnel, with half of the department assigned and integrated into the CTJV Completions to streamline and train Lean Processing to the JV. Provide the contraContractora resource for developing Lean Completions processes throughout the projecProject'stion, pre-commissioning, commisCommissioningt-uCommissioningmance testing phases of our projecProjectdition to actively participating and managed facility system reverse function block development, system and subsubsystemecution workflow development, completions execution coordination, participating in Operational Readiness reviews, issue identification and resolution and lesson learned management. Lead, facilitate, and manage all utility and process system "Process System Safety Reviews" for the Pre-Treatment, Liquefaction production Facilities, and Berth 6. Managed the facilitation of achieving compliance in Hazardous Chemical Introduction approximately 3 months earlier than scheduled, and LNG production of Train 6 and 7 six months before the contractual scheduled commercial delivery. The project schedule was captured, accelerated, and completed before the schedule. Mega Train 3and4 Project-RLC, Qatar. Project Completions Lead Foster Wheeler Jan 2007 – Dec 2008 Company Overview: MEG Project-Jurong, Singapore. Maintain and manage the Turnover Department, including processes, procedures, personnel, and the Electronic Data Management System. Maintain accountability for all data collections, compilation, documentation, and electronic data required to assemble assets into systemized formats. Responsibilities include facilitating the education of all project personnel on project documentation to ensure a thorough understanding of contract requirements concerning the certification of the works. Liaise with internal and external concerned parties to coordinate the use of the system by subcontractors and affiliates. MEG Project-Jurong, Singapore. Project Completions Engineer Chevron Jan 2006 – Dec 2006 Company Overview: TAHITI Project, Texas, USA. Provided technical expertise within HAZOP performed at multiple LNG facilities throughout Central and Gulf Coast USA locations, including issue identification, recommendations, and resolution follow-up. Facilitated and produced multiple base case finding resolutions, resulting in schedule generation, project scope assembly, and subsequent technical overview narratives for an expansive list of facilities capital and revitalization efforts, as well as resolving findings associated with HAZOP studies. TAHITI Project, Texas, USA. Project Completions Lead Santos Engineering Jan 2005 – Dec 2006 Port Harcourt, Nigeria Company Overview: EAP-1A Project, EXXON. Responsible for establishing, managing, and reporting the completion processes, programmatics, and procedures that allow for safe and seamless transition between Execution, Precommissioning, Commissioning, and Operations. Primary in establishing criteria of contract compliant Completions process entailing completions management driven by asset identification, scope delineations and deliverables in conjunction with establishing a Completions Data Management System the associated work flow processes resulting in 'Lean' Completions Management that provided a basis to open work fronts in the field and expeditiously validate the Facility Permanent works based on Pinnacle Document Concept. The project schedule was accelerated and completed in advance of schedule. EAP-1A Project, EXXON. Project Completions Lead BHP Billiton Jan 2004 – Dec 2005 Company Overview: ROD Development Project Algeria. Responsible for the Contractor in developing a completion program that is contract compliant and will allow for a safe and seamless transition between Execution, Precommissioning, Commissioning, and Operations. PrimarContractorting Contractor with establishing criteria of contract compliant Completions process entailing completions management driven by asset identification, scope delineations and deliverables in conjunction with establishing a Completions Data Management System the associated work flow processes resulting in 'Lean' Completions Management that provided a basis to open work fronts in the field and expeditiously validate the Facility Permanent works based on Pinnacle Document Concept. The project schedule was accelerated and completed in advance of schedule. ROD Development Project Algeria. Project Completions Lead BHP Billiton Jan 2003 – Dec 2004 Company Overview: Ohanet Field Development Project, Algeria. Responsible for the Contractor in developing a completion program that is contract compliant and will allow for a safe and seamless transition between Execution, Precommissioning, Commissioning, and Operations. PrimContractoristing Contractor with establishing criteria of contract compliant Completions process entailing completions management driven by asset identification, scope delineations and deliverables in conjunction with establishing a Completions Data Management System the associated work flow processes resulting in 'Lean' Completions Management that provided a basis to open work fronts in the field and expeditiously validate the Facility Permanent works based on Pinnacle Document Concept. The project schedule was accelerated and completed in advance of schedule. Ohanet Field Development Project, Algeria. Project Completions Lead BP-Amoco Jan 2000 – Dec 2002 Company Overview: Boquerón Project, Maturín, Venezuela. Accountable for developing, managing, and facilitating safe and systematic completion processes aligned with achieving the scheduled commercial completion of the facility. Responsible for defining asset and system boundaries. Designed, developed, and implemented the Boquerón Data Manager system for retaining, storing, and managing line summaries, equipment listings, instrumentation and electrical records, custody documentation, incomplete work listings, and report generation. Project completed ahead of schedule. Boquerón Project, Maturín, Venezuela. EDUCATION Bachelor's of Business Administration in Engineering and Project Management PCU - Jun 1986 CERTIFICATIONS Level II Visual Inspection, North American Power Services, 1993 Visual Tube Welding Inspection, Hartford Pipe Tube and Boiler, 1994 High Density Polyethylene Welder, Fluid Controls, 1996 Hazardous Waste Site Operations, Mansfield, MA, 1996 Waste Water Treatment Operations, Massachusetts State Class' B' License, 1997 AWARDS Qatargas 3 and 4 Train 6 and 7 and Berth 6 JADT Lean Completions Processing Award - December 2010 Qatargas 3 and 4 Train 6 and 7 and Berth 6 JADT Onshore - 264 million Manhour Safety Award - September 2010 Qatargas JETTY BOIL-OFF GAS Recovery Project - Recognition of Increased RFSU Processing Efficiency - June 2013
Superintendent, Manager, Engineer, Inspector, Other, Supervisor / Technician
20 years of experience in Instrumentation & Controls and SURF. Specialized in Engineering Design including Concept Select, FEED and Detailed Design. Participate in all project development cycle including Assembly & Testing, Fabrication & Construction and Hook-Up & Commissioning for Topside, Floater and Subsea project.
Engineer
I am a Designer of Senior Process Engineer, Process Safety, and Utility Engineer with 27 years of comprehensive experience in the design, engineering, commissioning, and operation of FSRU and LNG plants, including both onshore and floating facilities. Strong expertise across FEED, detailed design, EPC, and start-up support phases, with deep functional knowledge of re-gasification systems, BOG handling, utility systems, and marine integration. Renowned for rapid problem-solving and operational mitigation in high-pressure, time-sensitive situations—ensuring safety, availability, and continuous operation. Proven track record in resolving complex LNG/FSRU issues such as: * BOG Compressor over pressure: Quickly implemented real-time control optimization, dynamic tank pressure balancing, and load-shifting strategies like diverting BOG to fuel gas, adjusting send-out rate, or enabling vapor return to LNGC to prevent flaring and over pressure during LNG unloading. * Seawater Cooling System Clogging: Applied proactive measures like seawater screen filtration upgrades, bio fouling control programs, and dual-intake system operation during jellyfish or debris surge events to maintain continuous cooling for LNG vaporizers and process exchanges. * HVAC System Failures in Hazardous Zones: Successfully diagnosed air handling and pressurization unit failures through dew point and filter DP monitoring; implemented temporary bypass with filtered air units and reconfigured ducting to restore positive pressurization in ESD Class-1 Div-1 areas. * Water Treatment & RO Fouling: Resolved high membrane fouling and film formation in potable/utility water systems through root-cause chemical analysis, pre-treatment optimization (cartridge filters and antiscalant injection), and implementing automated CIP (clean-in-place) routines. Strong leadership in coordinating across process, mechanical, instrumentation, and marine teams to execute fast, safe, and cost-effective mitigations. Experienced with HAZOP/HAZID, SIL reviews, and ensuring compliance with IMO, IGF Code, IEC, API, and Class Society (DNV, ABS) requirements. * Proficient in HYSYS, PIPESIM, PIpefloe, OLGA and various control/simulation tools. Capable of preparing and reviewing all technical deliverables including PFDs, P&IDs, Cause & Effect Matrices, Operating Manuals, and Emergency Procedures
Engineer, Manager
Contributed in several Projects, familiar in engineering design and software, well versed with basic engineering activities such as process simulation and generating of material and energy balances, preparation of PFD, PID, PDS, preparation of process data for piping; detailed engineering activities such as P&ID and datasheet development based on the inputs from other engineering disciplines as well as vendor information, preparing & review hydraulic calculation, storage tank/vessel calculation. Familiar with Aspen Hysys and other Process Engineering software. Involve in many oil & gas projects and also refinery as process engineer and commissioning engineer in greenfield or brownfield project. Have capability to work in a team and can cooperative with inter discipline for apply good engineering design and to comply CODE & STANDARDS (API, ASME, ANSI, ASTM, etc).
Engineer
My name is Ekni Han Bin Abd Rahman. I am a multi discipline Professional. I have been involved for over 20 years in oil and gas industries consist of 1. Onshore LNG Process facilities , 2. Offshore process & utilities facilities at ( Platform /Island /FPSO/MOPU ) 3. EPC companies. General Key abilities : · Energetic work ethic and detail-oriented. · Motivates Team members. · Able to Supervise , manage & Coordinate works · Able to bring competitive & positive work Environment at work place. · Able to work in multicultural working environment. ·Understand the important of Communications and Team work at difference level / parties. ·To ensure task given in good progress and completed on time. · Proven Experience & expert in Coordination of Construction activities in Brownfield area. · Abilities to Lead and meet Client expectation (Time Frame) of work activities as per Instructions and target. · Specialize in monitoring and contribute information cross department during Construction Project phase , · Keep All Parties from ( Client / EPC / PMT) at the same page toward job completion Production/Operation Key Abilities · Familiar and understand work Instructions, work procedure, Permit to Work system, Fire Fighting System (Fields and Panel) and Housekeeping. · Expert of plant Operations (Panel and Fields ), Normal Operation & Troubleshooting. · A wide ranges of experiences in Pre-commissioning, Commissioning stages, Normal Operations, Start-up and Shutdown) · Provide , Coaching, Mentoring &Training (Field & DCS) for Operation team members . · Experience in process control & field troubleshooting.
Supervisor / Technician, Other
I am a male 31 years old, my background education Bachelor of Mechanical Engineering study program, hard worker, fast leaner, self-motivated and good interpersonal skill, more than 9 years experiences industy such as : oil & gas fabrication, shipyard, mechanical manufacture & civil construction. Specifically for Piping Engineer 3 years as Piping Engineer and more than HVAC Engineer 1 years also 7 years as design and drafter. During my time in the engineering department, I have skills in analysis, calculation, simulation moreover design modelling and drafting. In my work I am used to using CAESAR II software for (Pipe Stress Analysis), Autocad Plant 3D for (Piping & Equipment Modelling), Solidworks for (Mechanical Design) and finally Autocad for Drafting. I am confident in responsibility such as : piping analysis dan simulation, piping modelling and shop drawings, also create Material take Off (MTO) and Bill of Material (BOM). I also can be create design and simulation mechanical equipment include start from shop drawing until report.
Drafter / Designer, Engineer
Seasoned Mechanical Engineer with 20+ years of experience in Oil & Gas, Offshore Construction, and Mechanical Static Engineering. Proven track record in executing offshore rejuvenation projects, managing multi-disciplinary teams, and ensuring compliance with safety and quality standards. Adept at project lifecycle management, technical troubleshooting, and delivering engineering solutions under high-pressure environments.
Engineer, Superintendent, Supervisor / Technician, Manager
Dear Recruiter, Let me introduce myself, my name is Agung Setya Wicaksana, a highly motivated and experienced Project Engineer with 5 years of professional experience, I have gained extensive knowledge and skills in Engineering and Project Management, which I believe will be essential to help and enhance the operations of your company. I executed and managed projects, where I learned value engineering or best practices techniques and strategies that helped me in achieving project objectives. Besides, my strengths in problem-solving, planning, and teamwork have helped me excel in my previous role. I was responsible for procedure or Method of Statement project execution, cost and budget management throughout the projects' lifecycle, and project expenditure. I have been involved in the planning and scheduling of projects, ensuring that they meet the required deadlines and other objectives. I have also been experienced in identifying issues that arise in projects, coming up with effective solutions in a timely manner while collaborating with team members and stakeholders to ensure timely execution. My team-oriented mindset helps me to work collaboratively with cross-functional teams, ensuring that everyone strives toward a common goal and I am eager to apply them to further advance my contributions to the company.
Engineer, Other
I am Dair Djuwari Ngadenan experiences in drilling as Chief Mechanic more than 15 years
Supervisor / Technician
RUMENTATION AND CONTROL SYSTEM ENGINEER ▪ Having over 21+ years of experience in Basic & Detailed engineering, Testing, Installation, Pre-commissioning & Commissioning, and startup up activities of Instrumentation and control systems. ▪ Expertise in with Emergency Shutdown System (ESD/IPS), Fire and Gas System (FGS), High-Integrity Pressure Protection System (HIPPS), Burner Management System (BMS) and Distributed Control Systems (DCS). ▪ Experience in interfacing with various third-party control system communication packages through TCP/IP Modbus and OPC protocols. ▪ Knowledge in HAZOP, SIL determination and evaluation process. ▪ Proficiency in designing, implementation & testing of wide range of I/O, basic control functions, interlocks, Sequences, Operator interface and other control components. ▪ Expertise in managing engineering teams and provide technical guidance and mentoring as necessary. ▪ Proven abilities in swiftly ramping up projects with competent cross-functional skills and on time execution. ▪ Familiar with Piping and Instrumentation Diagram, Process Flow Diagram, Control Narratives, Cause and Effect diagrams, Shutdown hierarchy, Instrument data sheet.
Engineer, Manager, Superintendent
I graduated from the Islamic University of Indonesia, majoring in Chemical Engineering (2013 - 2017) and finished my Professional Engineer study (Ir.) from Bandung Institute of Technology (ITB) (Aug 2023 - Dec 2023) graduated with honors. I have Aspen Certified User certification from Aspentech University and valid from Jul 2023 until Jul 2026 My current domicile is in Tangerang Selatan, Banten, Indonesia. I have more than 5 years experience in EPC Company & Engineering Services Consultant. My current experience with PT. Tripatra Engineering as Process Engineer (Nov 2022 - Present) and my past experience in PT Berca Engineering International as Jr. Process Engineer (Aug 2021 - Nov 2022) and PT Timas Suplindo as Jr. Commissioning Engineer, Assistant Site Engineer & Engineering Document Controller for EPC Desalter Project at PT Pertamina RU III Plaju Sumatera Selatan for more than 2(two) years. I have completed some projects of Pre-FEED, FEED, DED and Proposal Project of oil and gas processing, petrochemicals and mining projects for Indonesian & Overseas Company and I have interest in new opportunities in terms of developing interpersonal skills.
Engineer
Committed and professional electrical, instrumentation and automation engineer familiar with standard electrical, instrumentation and automation requirements. More than twenty years experiences in proposal/tender, engineering design, procurement and project execution of electrical, instrumentation, automation control system and its construction for oil and gas, manufacturing and petrochemical industry. Strong management and leadership abilities for delegating tasks or providing instruction clearly and accurately. Prioritize, organize work and meet deadline. Strong communication skills, ability to work independently with best in team, self-motivated and ability to manage changing priorities.
Engineer, Manager
Engineer with a proven ability to drive sales growth in the technical environment. Expertise in Electricity, Renewable Energy, SaaS, Maintenance, Pneumatics, IoT, Industry 4.0, and more. Several years of experience delivering value and cutting-edge solutions to customers. Experienced professional with a diverse skillset spanning Team and Strategy Development, MRO Services, Technical Sales, Key Account Management, Customer Relationship Management, Operations, Digital Transformation, Business Development, Marketing, IoT & Industry 4.0, Consultative Selling, Reliability Engineering, Predictive Maintenance, Asset Management, Project Management, and more. I am well-equipped to make a significant impact and contribute to the growth of your business.
Engineer, Manager, Other, Inspector
SENIOR PROJECT ENGINEER with skills in Engineering/project management, Call for bid, procurement, negotiations, Contract review and recommendations, Subcontractor management, Safety procedures knowledge, Flexible, effective at multi-tasking, Multi-site operations, Analytical, Brownfield projects, Interpersonal skills, Onshore/Offshore, Drilling/Operation.
This is to hereby submit my candidature, against the existing "Snr. Process Engineer" role. Kindly note that I hold a Bachelors of Engineering (B.E) chemical engineering degree , and I am experienced (17+ years) in natural gas sweetening/ dehydration, compression, LPG /NGL Recovery / oil stabilization, petrochemical, and plastic (PET resin) manufacturing plants' process design (Basic/ FEED and detailed engineering), project execution/pre-mechanical completions checking, pre-commissioning, commissioning, startup and operations. I am skilled at; 1. Process design (Conceiving of the Simulations; HMB, Hydraulics Studies, Equipment Sizing, Design documents and Manuals etc) 2. Pre-commissioning, commissioning and startup as well as the Process operations of; a) Petrochemical b) Plastic resin production c) Natural gas processing (sweetening, dehydration and LPG recovery), d) oil handling, multiphase flowlines and separation e) Gathering and dispatch systems & metering. f) Crude oil, LPG storage, metering and dispatch systems. g) OSBL/ Process utilities including Flare, Firewater network,Fuel gas, I/A & N2, P/W etc 3. Process and Operational Safety 4. Project execution/ Interfacing. Moreover, I am well versed in process plant design documents such as the PFDs, P&IDs, C&E matrix, Philosophies, Data sheets, Manuals. I have generated and been a part of the teams that developed SOPs I have been scribe and part of the several Safety studies (HAZID, HAZOP,SIL) I have working experience with applicable national and international codes & standards including but not limited to APIs, ASME, NFPA etc. I am a steadfast team player and also I would come handy in prolonged field assignments and different locations as well. Further to above please note that from Aug 01st, I am immediately available to join
A Professional Engineer with more than twenty-five (25) years of experience in various phase of mechanical /piping scope of works. Involved in FEED, Detail Design (fluent with design software, i.e. PDMS and Caesar II), planning, contracting, tender bid evaluation, procurement, fabrication, construction, commissioning and project management scope of work within Petrochemical Plant, Upstream Oil & Gas, FPSO, Power Plant and Pulp/Paper Plant. More than 15 years in engineering and 10 years in project /construction management. Familiar with international standard
I am a recent completer of the Graduate Employability Enhancement Scheme (GEES) under PETRONAS, where I gained hands-on experience in energy transition projects and upstream production support. I am eager to bring my technical background, project exposure, and commitment to sustainable development to your organization, especially in roles focused on topside facilities and production engineering. During my tenure with PETRONAS Energy Transition Solutions (ETS), I was actively involved in Carbon Capture, Utilization, and Storage (CCUS) initiatives. I contributed to process simulations using Aspen HYSYS, assisted in the development of pre-FEED engineering packages, prepared technical documentation, and collaborated closely with cross-functional teams. This experience sharpened my understanding of process operations, front-end project execution, and decarbonization technologies in real-world applications. Previously, I served as a Process Safety & Risk Trainee at Integrated Process Solutions, where I supported safety studies such as HAZID, HAZOP, and QRA, aligned with PETRONAS Technical Standards (PTS). My role included preparing post-workshop technical reports and participating in multi-disciplinary reviews with client teams, deepening my knowledge of operational risk and asset integrity. In addition, I completed my degree internship as a Production Trainee, supporting the daily manufacturing operations of the lil SOLID 2.0 device. I handled component planning, scanning, and troubleshooting up to 3,000 units per day, contributing to quality control and process optimization. With a strong foundation in process engineering, production operations, and safety compliance, I am highly motivated to contribute to the development and integrity of topside systems and offshore production facilities.
**Senior Electrical Field Lead Engineer | Chief ETO (M.Sc.)** *18+ Years in Hull Conversions, New-Builds & Shipyard Leadership* I am a hands-on electrical field engineer specializing in **complex marine projects**, from hull conversions to DP3 vessel commissioning. With **direct CMHI Shipyard (Nantong) experience**, I bridge the gap between EPC contractors, construction teams, and design offices—resolving critical Technical Queries (TQs) and ensuring seamless HV (up to 10 kV), DP, and hybrid ESS integration. **Key Strengths:** - **On-Site Leadership**: Autonomous decision-making for electrical systems in shipyard environments. - **CMHI Expertise**: Recent success in commissioning and inspections at Nantong yard. - **Global Readiness**: Based in Shanghai/Nantong with valid Chinese visa; mobilizable after brief EU familiarization. - **Technical Breadth**: HV installations, Kongsberg DP systems, Orca ESS, and FAT/SAT oversight. I deliver **field-to-commissioning excellence**, combining rigorous standards with cross-cultural collaboration. Let’s connect to discuss how I can mitigate risks and accelerate your project’s electrical scope.
Engineer, Superintendent
Bachelor in Chemical Engineering, As a Process Engineer at OCIM Sdn. Bhd., I supervised production quality and supported technicians for smooth operation. Notable achievements include enhancing equipment design and process quality in 2023, leading a Distillation Tower start-up, and managing plant process enhancements in 2024. During my Testing Engineer training at SIRIM QAS International Sdn. Bhd., I specialized in product safety testing for metallic materials, gaining expertise in failure analysis.
Engineer
Dedicated, high-management standart, talented and result oriented professional to apply hands-on experience in process engineering & field expeirence (pre-commissioning & commissioning engineer). Learning on the Fly, Problem Solving, Intellectual Horsepower, Written Communications, Drive For Results, Decision Quality, Informing, Listening, and Dealing with Ambiguity. Intermediate knowledge of engineering design principles and applicable design guides and standards related to assigned engineering discipline.
Drafter / Designer, Engineer
HSE Professional with more than 20 years of experience in Health, Safety & Environment with various industry. Demonstrated excellent HSE Culture, behaviour, leadership and commitment in achievement of Company’s HSE Objective and Vision. 4+ Years of experience in Refinery & Petrochemical Development Project (RAPID) in the Engineering, Procurement, Construction & Commissioning of Ethylene Oxide & Ethylene Glycol (EO&EG) Plant and including with the Construction of Contractor Based Facilities. 9+ Years with multi experience in the Construction, Fabrication, Commissioning, Maintenance and Load Out for Topside, Jacket, Turret Block, Self Erecting Drilling Barge including Life Extension and Refurbishment of FPSO and FSO Project. 1+ Years of experience in Ready Mix Concrete Industries to supply and distribute to Pengerang Deep Water Jetty and Pengerang Deep Water Terminal. 6+ Year of experience in Port Service comprising of Marine, Logistics, Maintenance, Warehousing and Transportation.
Supervisor / Technician, Inspector, Other
As an Electrical engineer with ten of experience in electrical engineering, I excel in managing complex projects and leading technical teams. I oversee automation projects, negotiate with suppliers, and prepare technical and commercial bids. My previous roles at RMG, Cairomatic EG and Fine Peak Co. have equipped me with extensive expertise in tendering, RFQs, and project management for large-scale water and wastewater treatment plants. I hold a Master's in Business Administration and a Bachelor's in Electrical & Electronic Engineering Technology . I am passionate about innovation and efficiency, driving project success through strategic thinking and technical expertise.
Engineer