timesheetBid + Execution
Preparing 3D model and performing piping study for all equipment, based on the followings:
• Make sure latest inputs of Equipment Vendor Data, Equipment Layouts, Equipment List, Plot Plans, and etc. is
implemented.
• Maintain conformity with Project Specifications and Requirements, and with respect to accessibility, operability
and maintainability of equipment e.g. nozzle orientation, equipment elevations, orientation and adequacy of
ladders, service platforms, PSV lines, outlet fire water network for hydrants, monitors and deluge valves and
etc.
• Coordinate closely with Mechanical Equipment Engineer to ensure that the vendor data are available for all
equipment and highlight any missing data for equipment to the Mechanical Equipment Engineer.
• Perform pipe routing study and modeling of all lines ≥ 2”.
• Maintain conformity to P&ID and Line List. He shall ensure that specific process requirements such as slope,
free flow and no pockets etc. are incorporated.
• Maintain conformity with JSD for Piping Design, Workplace Design Specification and Working Instruction.
• Consider for Pipe Spacing (insulation thickness, guide and stopper).
• Consider pipe flexibility for stress lines category 1, 2 and 3 in his piping design activities.
• Prepare adequate operation and maintenance space such as ladders, stairs and service platforms and etc. for
valves, flanges, joints and instruments.
• Perform study, identify and propose pipe support locations, span. Then, prepare pipe support attachments for
issuance to the Stress team.
• Transfer all changes and mark-up from personal copy onto the Piping Master Copy (P&ID, Equipment layouts
and etc.).
• Solicit advice from either Piping Lead or Piping Checker or Area/Module/Unit Lead if there is any Piping Design
Concerns.
• Ensure 3D Models designed are clash free via coordination with various disciplines such as E&I, Structural and
etc.
About You
Must Have : Qualification, years of experience and skills
• Recognized Degree in Mechanical Engineering
• At least 10 years of working experience in Oil & Gas and Petrochemical field (especially
EPC project experience).
• Able to understand Aveva 3D Tool E3D or Intergraph SP3D
- Technical sound in Piping Engineering and Piping Design requirement.
- Experience working with 3D system (SP3D/E3D)
- Working experience in brownfield project.