Scope of Work

1.     Subsea well head operation involves well opening, well closing and monitoring DHPT as pert he requirements and logging data for well performance studies.

 

2.     Make Regular Checks of well heads, Separator, Instrument Air Kit and all measuring units to ensure that they are functioning properly as per the standard operating procedures.

 

3.     Report all instrument and equipment defects and leaks immediately to my senior engineer and take necessary action.

 

4.     To take reading from the Separator, well head, Gas injection online, Mainline and water injection line.

 

5.     In well testing each and every hour a variety of readings such as oil and gas flowtemperatureandpressureandrecordunusualoccurrencethenreportingat my senior engineer.

 

6.     Start, check and stop diesel generators and pumps according to the instructions. Open or close the water injection distribution and gas lift manifolds on the satellite which process platform to the well head platform.

 

7.     Assist in isolating – draining, Purging and handing over equipments for maintenance on inspection and check the equipment for correct operating when the maintenance job is completed.

 

8.     Make the routine weekly run test of equipments like emergency diesel generator, diesel and electrical fire pumps. With the guidance of senior,

 

9.     Launching pigs into pipeline sand receiving pigs from pipeline and check it for damages. Unfold chemicals into tanks for injection start and adjust the flow rate of chemical injection pumps as required. Collect oil, gas and water samples.

 


Software

Software

N/A

Company specifications

Codes and standards

abs modu