Project Location: China (initial phase) & Indonesia (later phase)
Project Duration: ~2.5 years (1 year in China, followed by ~1.5 years in Indonesia)
Contract Type: Direct Hire
Rotation: Full-time, with rotation as per project needs
Project Context:
Join an international FLNG (Floating LNG) Project with one of the largest energy operators in Asia, in collaboration with a major EPC player in China. This role is ideal for experienced professionals with strong FPSO/FLNG backgrounds and a preference for candidates already based in China or with experience working there.
Key Responsibilities:
- Review contractor’s utility system documentation (datasheets, drawings) for compliance.
- Coordinate with Topside Process team and onshore interfaces.
- Support vendor package reviews, FATs, and commissioning readiness.
- Assist in pre-commissioning, vendor follow-up, and commissioning.
- Option to roll over into operations support phase for warranty items.
Requirements:
- Degree in Marine or Chemical Engineering.
- Minimum 8 years in FPSO/FLNG process & utility systems.
- FLNG EPC project experience preferred.
- Health clearance is required (no heart conditions, diabetes, or high blood pressure).
- Strong communication skills; Mandarin proficiency is a major plus.
- Willingness to rotate between China and Indonesia.
- Must pass criminal background check and hold valid university credentials.
Compensation:
- Based on current package.
- Additional 15% overseas allowance (after tax).
- Flights and business visa sponsored by the company.