Main discipline
Coating/Painting
Experience
Specialist (> 15 years)Nationality
ChinaOther discipline
Highly dedicated, positive-attitude, self-motivated, confident responsible person with 17 years professional working experience in Supervisory, QA/QC & Engineering knowledge in Construction, FEED and Pre-Commissioning activities. Manage to handle pressure work activities with collaborative working attitudes including implementation of HSE site working intervention on any unsafe act or unsafe condition on-site operation. Interpersonal skills self-starter having ability to work in a high paced environment with multi-national contractors having different cultures & behaviors. Proactive in construction supervision activities and QC inspection acceptance on hot and cold insulation, external and internal coatings, fireproofing and refractory for above & underground pipelines, vessels, columns and tanks through years of work in maintenance and construction owned by Golar WOODSIDE CHEVRON, SINOPEC JACOBS and CNOOC projects in China. Experienced in FLNG, FPU FPSO coating, cryogenic, thermal insulation engineering, installation, inspection and maintenance for LNG piping, equipment, vessels, heat exchangers, columns, LNG storage tanks and tankers. Familiar with material properties and material preservation application. Effective communicator and understanding application of Code/Standard and specifications work related on insulation, coating and fireproofing stated in ISO / ASTM / NACE / API / BS / GB / NORSOK. Knowledge for the execution in piping, mechanical and commercial insulation engineering, QC aspects, safety procedure and maintenance best practices reference with US & European specifications such as PIP/CINI/DEP/FESI/MICA/TIAC. Familiar with gas processing plant procedures, LNG production, storage and transporting, offsite modular fabrication, analyzing hook-up & PID design, commissioning philosophies and process Insulation installation requirements. Highly trained in HSE Work Permit Systems, Lock Out &Tag Out and Clearing Punch-lists prior to Pre-commissioning Maximum Operation Pressure (MOP) Test and Final Project Handover.
•••••
2020 - 2021
•
•••••••••••••••••••••••
2018 - 2019
•
••••••••••••••
2017 - 2018
•
••••••
2015 - 2017
•
•••••••••••••••••••••••••••••••••
2012 - 2015
•
•••••••••••••••••••••••••••••••••••••••••
2012 - 2012
•
••••••••••••••••••••••••••••••
2009 - 2012
•
••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
1970 - 2022
•
No reviews