Main discipline
Mechanical
Experience
Senior (5-10 years)Nationality
EgyptOther discipline
Perform PM , CM plan for all types of X-Tree valves ( Loose &Block ) types F,FL , FLS ,FC
with material trim HH,EE,AA Cameron and FLS trim EE for Tharwa Breda according to API 6A
Execute repair memo for leaking valves after pressure build up PBU test which issued by well integrity
Replace internal passing for gate v/v assembly of SV,UMV,LMV,FLWV,XTWVafter apply two mech. barriers
Maintain all natural flow and artificial lift wells ( gas lift , ESP ) and water injection wells
Provides support for commissioning and processing of technical claims when needed
Maintain all oil & gas top side production facilities such as(piping , pig traps, chokes , manifolds, Separators )
maintain for all types of isolation valves such (gate, ball , plug ,check ,butterfly) according to API 598, 594 , 6D
Construct oil & gas pipe lines and headers after Fabrication and Welding .according to API 5L
Hydrostatic test for isolation valves, oil & gas pipe lines after fabrication & RT completed.
Follow up sandblasting & painting for oil & gas pipe lines after hydrostatic test completed.
Replace defected ( oil , gas & water Inj.) pipe lines and headers ( apply simple & complicated lifting plan )
Implement FCP ( facility change process ) according as built drawing and material list , process flow diagram
Prepare using Maximo six week plan , seven days plan & KPI for PSS Division
Infrastructure replacement according to anomaly report scope of work which is issued by inspection Division
Perform PM &CM plan for all safety equipment, firefighting system foam station , eye wash , life rafts )
Prepare safe work pack including ( RA, Lifting Plan , Isolation & Performing ) Procedures ,PTW
Formalizes the hand-over of equipment from the various plant systems to Operation Division
Proposes measures to improve reliability and availability of critical equipment and minimize their failure rate
Prepares works and executes supervision during S/D & overhaul maintenance
Advises on spare part replacement, modifications or refurbishment needs during major maintenance works
Reviews requirements for spare parts including preservation aspects, determines stock levels
••••••••••••••••••••••••••••••••••••••••••••••••••••