Main discipline
Structure
Experience
Specialist (> 15 years)Nationality
IndonesiaOther discipline
17 years experiences as an structural engineering design covering range of activities (feed, detail design and survey) in offshore Oil and Gas Industry.
A) Offshore Structural Designer (10 years)
1. Topsides Drawing, including :
- Plan deck drawing.
- Deck lifting padeye details.
- Join details.
- Deck elevation and section.
- Stair, ladder, and details.
- Swing rope details.
- Plan escape route.
- Equipment layout.
- Access platform.
- Skid beam.
- Drainage and hatch cover deck.
- Vent boom / flare and boom rest.
- Crane pedestal.
- Bridge/walkway.
- Heli deck and safety net.
- Material Take Off (MTO).
- Material Requisition (MR) / Bill Off Material (BOM).
- Orientation Platform.
2. Jacket Drawing, including :
- Pile make-up and details.
- Conductor and details.
- Caisson make-up and details.
- Jacket lifting pad eye and details.
- Jacket elevation.
- Plan jacket.
- Guardian sleeve.
- Conductor guard and details.
- Plan mudmat and details.
- Boatlanding and details.
- Anode location and details.
- Riser clamp and details.
- Jacket walkway.
- Shim plate, cone, crown jacket.
- Material Take Off (MTO).
- Material Requisition (MR) / Bill Off Material (BOM).
- Orientation Platform and boatlanding.
- Apparent Batter (4leg, Tripod, Brace Monopod).
- Platform/ Jack Up approach.
3. Sequence Installation Jacket, Topsides, Equipment, Boatlanding and Modication topsides
4. Sea fastening & tie down
5. Concept Design Fixed / Jacket Offshore Platform
B) Onshore Structural Designer (7 years)
- As-Built platform on fabricator.
- Preliminary design LNG storage & regasification.
- Preliminary design PLTG peaker.
- Design CNG filling station
- Design workshop, shelter, access platform.
- Concept Design WTP(Water Treatment Plant)
- FEED & DED for ORF WWTP
- FEED & DED for PV farm hybrid
- Design lifting arrangement mobilization equipment CNG
- Preliminary design LNG terminal
- Design SPLU(Stasiun Pengisian Listrik Umum)
- Design layout regasification and CNG paaker.
- Design layout site office
•••••••••••••••••••••••••••••••••••
2022 - current
•
••••••••••••••••••••••••••••••••••••••••••••••••••••••
2022 - 2022
•••••••
••••••••••••••••••••••••••••••••••••
2017 - 2022
•••••••
••••••••••••••••••••••
2015 - 2016
•••••••••
••••••••••••••••••••••
2015 - 2016
•
••••••••••••••••••••••••
2014 - 2015
•••••••
••••••••••••••••••••••••••••••
2014 - 2015
••••••
•••••••••••••••••••••••••••••••••••••••
2013 - 2014
•••••••
•••••••••••••
2013 - 2014
•••••••••••••••••••••••••••••••
•••••••••••••••••••••••••••••
2012 - 2012
•••••••
•••••••••••••••••••••••••••••
2012 - 2012
•
•••••••••••••••••••••••••••••••
2005 - 2012
•••••••
No reviews