About
●Engineered/Constructed/Commissioned 250+projects worldwide: 150+ small $1-$10 million; 75 medium $10-$99 million; 16 large $100-$900 million; & 10 mega-projects of $1 to $24 billion.
●Successfully Managed – Up to 30 concurrent projects.
●Licensed Professional Engineer: California & Alaska, can be licensed anywhere worldwide by comity.
●Education: BSME from University of California, Berkeley (always in the top 5, worldwide).
●Upstream Oil & Gas: 36 Oil & Gas Production / Separation / Reinjection / Shipping Facilities; Sealift modules to 2,600T/2320mT; 100s of Drillsites / Truckable Modules to 40T/36mT; 4000mi/6400km of Gathering / Injection Lines up to 60”/1500mm x 740psig/50barg and 24”/600mm x 3,280psig/221barg.
●Midstream Oil & Gas: 18,260mi / 29,216km of Transport Pipelines. Diameters to 60” / 1.5m & pressures to 5230psig / 361barg. Largest: 48” / 1.2m x 1180psig / 80barg x 800mi / 1280km and 40” / 1m x 1480psig / 100barg x 2400mi / 4000km (onshore, offshore, oil, gas, products, CO2, batching, spiking, conversions, reversals)., 75 Pump Stations; 45 Compressor Stations; 100+ Meter Stations; 3 underground gas storage plants; 11 major Terminals (marine, pipeline, railroad, truck, piers, loading arms, AFFF, recycle pipelines, fixed & floating roof tanks to 500,000bbl / 60,000cm, gas storage bullets and spheres).
●Downstream Oil & Gas: 6 Refineries (including 2 majors $3.5B & $1.5B; 30 concurrent turnaround projects), 1 Gas Plant; 20 retail gasoline / diesel / lubricant / LPG stations; 4 distribution centers.
●BU Power Plants Combined-Cycle CoGeneration: 40 to 50 MWe backup power plants as part of larger projects.
●BU Power Plants Diesel: 150+ 0.25 to 4.5 MWe backup power / remote main power plants as part of larger projects.
●Power Plants Solar: 300+ 0.25 to 2.5 MWe off-grid valve & meter station power as part of larger projects.