Construction Manager – FPSO Topsides (36-Months | KL)

timesheetExecution

Scope of Work

Location: KL Trillion, Kuala Lumpur, Malaysia

Duration: 36-months direct hire contract

Start Date: ASAP

Work Arrangement: Office-based (with potential site visits)

Project Type: FPSO SEPAT Redevelopment – Topsides Fabrication

Hiring Type: Direct hire by engineering contractor (operator-side PMT)


Key Responsibilities

  • Lead fabrication oversight for FPSO topside modules, including structural steelwork, piping systems, and equipment integration
  • Coordinate technical execution between PMT, yard, and EPC contractor(s)
  • Ensure adherence to fabrication schedule, QA/QC standards, and HSE compliance
  • Review and manage lifting strategies, construction sequencing, and fabrication progress reports
  • Participate in constructability reviews and resolve site-level technical challenges
  • Provide daily progress tracking and interface coordination with design, commissioning, and procurement teams


Candidate Requirements

  • Bachelor’s degree in Mechanical or Structural Engineering
  • Minimum 10 years in offshore oil & gas fabrication/construction roles
  • Completed at least 2 FPSO projects involving topside fabrication
  • Strong knowledge of fabrication methods, lifting plans, and module integration
  • Familiar with AWS, ASME, API, or equivalent fabrication standards
  • Excellent communication and leadership in multi-stakeholder environments


Preferred

  • Experience on Malaysian offshore redevelopment projects
  • Familiarity with PMT execution models and fabrication yard coordination

Software

Software

N/A

Company specifications

N/A

Codes and standards

N/A