Senior Marine Engineer to assist Lead/Deputy Lead Marine Engineer to prepare critical deliverables required for FPSO Barracuda early engineering phase.
Key results expected are being able to produce PFDs, P&IDs, Piping design, calculation, sizing, etc., with limited guidance as a hands-on Engineer.
Prior experience of working in Petrobras Projects and awareness of Brazil regulatory compliance requirements .
The candidate shall have at least 8 years’ experience in floating units’ marine systems for FPSOs, preferably worked in Petrobras FPSO Projects.