Main discipline
Mechanical
Experience
Specialist (> 15 years)Nationality
IndiaOther discipline
Over 24 year’s experience in Oil & Gas, Petrochemical upstream well head pipeline hydrocarbon
processing/utility units and Tank API 650 cone roof fluting roof in Saudi Armco oil/gas industry and have overall
expertise in pipeline technologies Has been recognized as a specialist in specific engineering fields on large to mega
projects Must have a thorough knowledge of engineering practices, economic principles, calculation methods, design
details, international codes, standards, procedures, and specifications Provides guidance to the project detail
design engineering work. Experience as a Principal Engineer in a similar environment, running small teams of
pipeline engineers Familiarity with industry standards Familiarity with quality control systems in engineering
design Coordinates with project discipline and lead engineers to ensure correct implementation of the design for
his engineering specialty and coordinates the work of engineers within his specialty Prepares and reviews
engineering studies, design drawings and documents and material and equipment specifications Resolves specialty
related engineering issues by applying accepted principles, codes, and standards. Provide technical excellence and
standards for the department to Prepare workforce staffing requirements and schedules for projects and prepare the
site and liaising with other construction professionals such as architects, engineers, buyers, estimators, and
surveyors before construction work started. Developing the program of work and strategy for the project.
Planning to prevent problems on site before they occur, for example, planning the Delivery and storage of
equipment and materials. Making safety inspections of the site when work is underway and ensuring regulations
relating to health safety and the environment (HSE) are adhered to. Overseeing the running of several projects.
Using construction management software packages to plan smooth workflows. Communicating with a range of
people in clouding the client, subcontractors, suppliers, the Public, and the workforce. Schedule the project in
logical steps and budget time required to deadlines Determine labor requirements and dispatch workers to
construction Understand project insurance requirements and initiate action to secure coverage in line with
contractual obligations. Review Safety and QA/QC project plans with respective functional heads and submits them to
Client for approval. Resolve any contractual/legal matters and ensures that appropriate action is Monitor the
demobilization plans of the workforce and plant as the project progresses to facilitate the relocation of the
workforce and the further utilization or disposal of the plant. Act as the Company’s official representative with clients,
suppliers, and third-party contractors - negotiating terms and conditions where necessary, ensuring that Company
interests are both optimized and protected. Monitor the performance of suppliers and subcontractors to determine
compliance with contractual obligations. Resolve issues arising from disputes or sub-standards. performance.
Monitor payments from clients and initiate payments to suppliers and sub-contractors ensuring all terms and
conditions have been met. Manage the preparation and presentation of the final documentation and liaises with
the client for the issuance of the acceptance certificate and release of performance bonds and bank guarantees.
Participate in a formal review of the project with relevant parties on completion and Identify opportunities for
learning and development.
••••••••••••••••••••••••••••••••••••••••••••••••••••
2022 - 2023
•
••••••••••••••••••••••••••••
2021 - 2022
•
••••••••••••••••••
2018 - 2021
••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••
2016 - 2018
•••••••••••••
•••••••••••••••••••••••••
2015 - 2016
••••••••••••••••••••••
•••••••••••••••••••••••••••
2014 - 2015
•
••••••••••••••••••
2013 - 2014
•
•••••••••••••••••••••••••••••••••••••••••
2011 - 2013
•
••••••••••••••••••••••
2009 - 2011
•••••••••••••
•••••••••••••••••••••••••
2000 - 2002
••••••••••••••••••
••••••••••••••••
1970 - 2008
••••••••••
Jan 1997 - Jan 2000
Jan 1994 - Jan 1997
Jan 1991 - Jan 1992
No reviews