More than 11 years of experience across India, Abu Dhabi, Iraq, Oman, Kuwait & Qatar as Piping Engineer, Piping Supervisor, Construction Supervisor in executing Oil & Gas projects.
Worked on fabrication & erection activities of U/G & A/G piping, CS, SS, LTCS & as in live and new plant.
Worked for Piping, Structure, Equipment, Cladding and all Mechanical related work.
Proficient with Eng. codes & specifications like ASME B.31.3, B.31.1, ASME-16.5 NACE standards
Rich experience of preparing piping related drawings like isometric, general arrangement, P&ID, pipe support drawings, plan, plant smart viewer (3D) and structure drawings
Perform piping Line Check and writing punch list then carrying out A punch clearing work prior to hydro test.
Supervised & led teams, allocated work profiles, prepared various reports and reported to the management & client.
Successfully led completion of projects MEGA TURN AROUND 2021 EP1 Machine Replacement Shutdown Project (QAPCO) Mesaieed, Doha Qatar, Kuwait New Refinery Project Package-5 Al-Zour (KNRP) Kuwait, Sohar Refinery Improvement Project (SRIP) Oman, Central Processing Facility (CPF) Badra Oil Field Iraq, Asab F F D Project Abu Dhabi (UAE)
Erection and alignment of fractionation columns, stripper column, sweetening and stabilization column, sour water stripper column and Amine regeneration column, Compressor, Turbine, Exchanger, Condenser, Pumps and Lube oil skid.
Erection and alignment of flare HP and LP knock out drums, slag catcher, water draw of vessels, electrostatic deserters, stage separators, fin-fan coolers, heat exchangers, purge bins, instrument air and plant air receivers, degassing gas boots, fuel gas scrubber, nitrogen purification vessel.
Supervise for installation of 1.6 KM onshore and 1.7 KM offshore Sulphur Belt Conveyor System including main Conveyor structure, 5 Transfer Tower structure, Magnetic Separator, Elevated Gallery, Ship loader and all Cladding work.
Skilled in executing piping erection, punch listing, hydro testing, and commissioning activities of complete piping system.
Collaborated with cross-functional teams to ensure completion of project.
Excellent communication & interpersonal skills with strong analytical, problem-solving, and organizational capabilities