About
The ability to do the following:
• Quality assurance and quality control work
• Preparing quotation
• Performing inspection or witness activities such as:
- Weld fit up,
- internal and external welding visual,
- final dimension inspection,
- witness hydro test,
- witness proof test, acc to PED and TPED requirement
- Witness Cold stretch in accordance with ASME VIII Div 1 EN code, AD 2000 and client specification.
- Surface profile Inspection after sand blasting
- Cleaning inspection
- Painting inspection (DFT check)
- Preparation for shipping and packaging inspection.
- Material income inspection
- Final inspection before shipment
- MT, PT and hardness test
• Inspection and consulatancy for the refurbish of pressure equipment.
• Material upgrade inspection
• Preparation of Inspection Release Note (IRN)
• Review documents prior, during and after fabrication of a pressure equipment such as:
- MT report, PT report, UT report, Visual report, Hardness report, HT report, Mill certificate report, Heat Treatment report, Coatings report, WPS, PQR, PWHT report and RT report.
• Able to read and understand a P&ID diagram
• Able to read and understand pressure equipment drawing
• Perform UT thickness measurement.
• Supervise welding activities for:
- WPS, WQT, Brazing test, Production welding
- Welding during fabrication of pressure vessel and piping fabrication
• Prepare and Review document such as:
- WPS, welder qualification test certificate, welder operator certificate and Material upgrade certificate.
• Familiar with the following code: ASME IX, ASME VIII, ASME V, B 31.3, B16.5, EN 10028, EN 15609-4, AD 2000,EN 9606-1, EN 14732, EN 13445 , PED, TPED, API 510, API 570 and others
• Knowledge and experience of welding processes such as SAW, TIG, SMAW, GMAW, FCAW.
• Basic welding skill of SMAW, GMAW and FCAW processes
• Ability to manage project of large scales from start to delivery and ensure smoothness of project
• Write inspection report (organise)
• develop inspection test plan
• Co-ordinate with the clients or contractors on the working schedule
• Can work effectively in a team environment and as a team
• Good planning, organisational, Good time management and supervision skills
• Good in dealing
• Good understanding and knowledge of the manufacturing and inspection process of pressure equipment.
• Good communication skill
• Able to build good relation, communication and manage contractors at site
• Willing to learn, and teach
• Able to work independently
• Always ensure client satisfaction on the project handle.
• Able to generate NCR during inspection , follow up and close out punch lists or NCR
• Problem solving ability
• Good presentation skill
• Experience in working in manufacturing environment.
• Basic Knowledge of the principles of 5S
• Inspection of PED cryogenic equipment
• Able to perform internal audit
• Review pressure equipment drawings and documents, lifting equipment drawings and documents, to do DOSH submission for approval (department Of Safety and Health, Malaysia). Follow up and handle meeting with DOSH as client representative.
• Ability to handle contractor at site in the role of client representative, 3rd party inspector or owner QC on site
• Able to supervise and manage inspection activity of piping fabrication work during construction of new plant or extension of plant
• Able to supervise and manage inspection activity of large scales of pressure equipment fabrication.
• Experience with 3rd party inspection, client representative, owner QC representative, QA/QC roles.
• Experience in Inspecting piping work, pressure vessel, Gas drum, boiler, and others pressure equipment
• UT Thickness Measurement